Activity 2
- Draft a simple ToC diagram for the "Healthy Communities Through Improved WASH in Nsanje" project. Include 1 pathway of change (Inputs → Outputs → Outcomes → Impact), and at least 1 assumption critical to success.
- Draft a simple Logframe entry for one Output and one Outcome of the project. Your entry should include:
- The Output and Outcome statements.
- One Objectively Verifiable Indicators (OVI).
- One Means of Verification (MoV).
- One important Assumption.